Fabrication of Stack & Upper part of Tail Gas project at Jordan Phosphate Mines Co. "JPMC". AGN was a the main contractor with full responsibility to replace the old stack, Our scope of work were, engineering , supplying all required material, fabrication "includes painting and internal rubber lining" and dismantling the old stack and upper parts, and finally the erection of the new fabricated parts, this project was a huge milestone which AGN has successfully performed.
Procurement, Fabrication, Welding, Blasting, & Painting a 16 meters long 48” Stack to our well known client “Jordan Bromine Company”. The stack was fabricated in our hanger in Amman and was transported and unloaded safely.
a “Very” critical Shutdown for Hot Thickener Tank in Arab Potash Company for which our team have made Steel & Rubber Lining repair of about 25 Square Meter in 48 hours. Our quick response to such critical task, safety precautions while doing the work, the quality provided, customer satisfaction and on top of all; our dedicated team differentiate AGN from others.
Replacing of Crystallizer #2 project at Arab Potash Co. AGN was a part of the project team and has successfully performed scaffolding works, insulation & cladding works, fabrication & welding works, piping reinstatement works, mobilization and supplying services.
Testing, Troubleshooting And Commissioning Of PKG 2 & PKG 3
Complete Engineering, Supply, Install, Test and Commission of Electrical Systems For Palace Justice In Jarash.
AGN Engineering & Contracting Co.
Amman-Jordan/ Hosni Souber St., Al Salam Building (29)/ 2nd Floor
Mob.:+962795453890 E-mail:info@agn-contracting.com
Copyright © 2019 AGN-Contracting - All Rights Reserved.
Powered by GoDaddy